CEE 266 Construction Management
Files marked with a lock are password-protected. Students: use the username and password given in class.
Course Handouts in PDF
Disclaimer: Students are expected to keep their own notes. The handouts highlight the lecture content and are by NO MEANS a complete set. The instructor reserves the right to make changes that may not be reflected in the handouts below, it is the students' responsibility to keep a complete and current set of notes for each lecture.
Class Lectures| No. | Description | Slides | Take Notes |
|---|---|---|---|
| 1 | Introduction, Construction Industry, CM Functions (READ Ch1/2 & 3) | Lect 1 | Lect1N |
| Visiting Lecture: | |||
| 2 | Project Organization & contracting (READ Ch3 & 8) a) Delivery Methods, b) Payment Scheme c) Award Methods, d) Contract components & Admin, e) Contract Documents, and Contract Document Samples | Lect 2a Lect 2bc Lect 2d Lect 2e | Lect2aN Lect2bN Lect2cN Lect2dN |
| Visiting Lecture: | |||
| 3 | Scheduling Techniques (READ Ch4), a)Deterministic Scheduling, b) PDM, c) Velocity Diagrams d) Resource Allocation (I & II). e) PERT CPM-Part1 Video CPM-Part2 Video | Lect 3a Lect 3b Lect 3c Lect 3d Lect 3d2 Lect 3e | Lect3aN Lect3bN Lect3cN Lect3dN |
| 4 | MS Project Part1 Handout and
Vidoe Intro. MS Project Part 2 and Video Part 2 | ||
| 5 | Cost Estimation, (READ Ch 5), & RSMeans a)Conceptual & Preliminary Est. (Uniformat II and CSI Masterformat 2004) b) Assembly Esitmation Estimate Uniformat Excel c) Detailed Estimation d) 1.Gen. Req./Equipment, 2.Measurement Met(Quantity Takeoff) e) Labor/Overhead Distrib. | Lect 4a Lect 4b Lect 4c Lect 4d1 Lect 4d2 Lect 4e Revit TakeOff | Lect4aN Lect4bN Lect4cN Lect4dN Lect4eN |
| 6 | Estimating Heavy/Civil Projects, parts a&b (READ Ch 6) Cashflow and Cost Distribution Cost Distribution Video Intro | Lect 5a Lect 5b Lect 5c | Lect5aN Lect5bN |
| 7 | Building Materials (READ Ch 13) and (READ Ch 14)
| Lect 6a Lect 6b | Lect6a Lect6b |
| 8 | Estimating Building Projects (READ Ch 7 pp.212-246) Cranes & Loaders (READ pp.380 -, 389-) | ||
| 9 | Estimating Building Projects (READ Ch 6 pp.228-cont.) | ||
| 10 | Procurement, Contract Admin., Bid Types and Process(READ Ch 8) | ||
| 11 | Earned Value Analysis (EVA) (Ch 3 pp.78-84) | Lect10 |